v1.2.9
Browse
Contributors
squote.app
Suggest an article
×
Suggest an article
Missing a topic? Tell us what you need and we'll add it to the queue.
What topic do you need? *
Trade / category
Why do you need it?
(optional)
Your name
(optional)
Email
(optional — to notify you when live)
Submit suggestion
Squotipedia
›
Electrical
Electrical
37 articles
Arc Fault Detection Devices: BS 7671 Recommendation, Type A vs F AFDD, Bedroom Installation and Consumer Unit Position
BS 7671 Regulation 421.1.7 recommendation for bedrooms and escape routes, Type A (sinusoidal) vs Type F (non-sinusoidal) AFDD, combined RCBO+AFDD device, consumer unit position
Bathroom Electrical Zones: What Can Go Where?
BS 7671 bathroom zones 0/1/2: IP ratings per zone, equipment allowed where, supplementary bonding requirements
Bathroom Extractor Fan Wiring: Timer, Humidity Sensor, Overrun & Zone Compliance
Bathroom fan wiring: timer fan (SL+L+N+E connections), humidity sensor fan, 15-minute minimum overrun, IPX4 zone 1 requirement, Part F 15 l/s minimum extract rate, pull-cord isolation in zone 2
CCTV and Alarm Wiring: Cable Types, Power Over Ethernet, Part P & GDPR Considerations
CCTV installation: IP cameras via CAT6+PoE (IEEE 802.3af/at), analogue HD coax, intruder alarm grades BS EN 50131, GDPR signage requirement, SPD protection for outdoor circuits
Consumer Unit Standards: RCBO, SPD, and Amendment 2 Requirements
Consumer unit standards: RCBO vs split-load, SPD requirements under Amendment 2, metal CU mandate, selection guidance
Consumer Unit Upgrade: RCBO Boards, Metal Enclosures & Amendment 3 Requirements
Consumer unit upgrade: metal enclosures mandatory since 2016; RCBO boards (per circuit); SPD required under BS 7671:2018 Amendment 2; Part P notifiable
Cooker & Hob Circuits: Cable Sizing, Control Unit Requirements & Dual Appliance Rules
Cooker circuits: BS 7671 Appendix 15 demand calculation, 10mm² T&E for 14kW range, dual appliance rule (oven + hob within 2m), 45A DP control unit within 2m, RCBO protection
Data & Comms Cabling: CAT5e vs CAT6 vs CAT6A, Structured Wiring & Home Networks
Data cabling: CAT5e (1Gbps/100m), CAT6 (10Gbps/55m), CAT6A (10Gbps/100m), T568B patch wiring standard, structured wiring cabinet, Part R 2022 notifiable work requirements
Domestic Lighting Design: Lux Levels, Circuits Per Floor & LED Driver Types
Domestic lighting design: lux levels (kitchen 300, living 150–200, bedroom 100), LED driver types (constant current vs voltage), dimmer compatibility, circuits per floor best practice
Door Entry and Access Control Systems: Wiring, Standards and Planning Considerations
Door entry and access control: BS EN 60839-11-1 grade classification, BS 7273-4 fire alarm integration, UK GDPR considerations for camera-linked systems, 12/24V DC power supplies
Earthing & Bonding: Main Equipotential Bonding, Supplementary Bonding & BS 7671
Earthing and bonding: PME/TN-S/TT supply systems, main equipotential bonding 10mm² (PME), supplementary bonding in bathrooms, CPC sizing, Amendment 2 relaxation
Electric Shower Installation: 8.5kW to 10.8kW Circuit Sizing, RCD Protection, Minimum Water Pressure and Part P Notification
8.5kW/37A on 6mm² T&E, 10.8kW/47A on 10mm² T&E, 30mA RCD mandatory, 1 bar minimum dynamic pressure, Part P notification to Building Control
Electrical Testing & EICR: Periodic Inspection, Test Schedule & Documentation
Electrical testing: EICR C1/C2/C3/FI coding, test sequence (continuity→IR→polarity→Zs→RCD), EIC vs MEIWC documentation, 5-year mandatory rental property cycle
Emergency Lighting: BS 5266 Requirements, Testing Schedules & Log Books
Emergency lighting: BS 5266-1 requirements, maintained vs non-maintained fittings, monthly/annual testing, log book obligations
EV Charger Installation: Circuit Requirements, DNO Notification & OZEV Grant
EV charger installation: 7kW (32A) circuit requirements, DNO G99 notification, OZEV grant eligibility, smart charger mandate
Full House Rewire: When You Need One, What's Involved & Typical Timelines
House rewire: trigger indicators (rubber/fabric cables), duration by property size, Building Control notification requirement
Heat Pump Electrical Connections: Circuit Sizing, DNO Notifications and Smart Controls
Heat pump electrical connections: G99 notification for >3.68kW, MCS installer requirement, 6mm²/10mm² circuit sizing, time-of-use tariff smart controls, BUS grant compliance
Home Battery Storage Systems: Installation, DNO Registration and Fire Safety
Home battery storage: G98/G99 DNO notification thresholds (3.68kW), BS EN 62619 lithium battery safety, dedicated circuit (32A RCBO), fire safety separation, BS 7671:2018 Amendment 2
Interconnected Smoke Alarm Wiring: Mains, Battery & RF Linked Systems
Smoke alarm wiring: Grade D LD2 minimum per BS 5839-6:2019; 3-wire hardwired interconnect; RF wireless systems; CO alarm mandatory for solid fuel (England)
Intruder Alarm Installation: Grade 2/3, Wired vs Hybrid Wireless, EN 50131 Standards
Kitchen Electrical Circuit Design: Ring Finals, Dedicated Circuits and Part P Requirements
Kitchen electrical circuits: ring final vs radial, dedicated circuits for cooker/dishwasher/fridge, RCBO per circuit, BS 7671 kitchen zone rules, Part P notification requirements
Lighting Circuit Wiring: Loop-In Method, Junction Box & LED Driver Types
Lighting circuit wiring: loop-in vs junction box method, LED driver types (constant current/voltage), trailing vs leading edge dimmers, neutral at switch positions
Old Rewirable Fuse Boards: EICR Implications, When to Upgrade and What You Find Inside
Old rewirable fuse boards: BS 3036 limitations, EICR coding (C2 for absent RCD), rental property 28-day remediation obligation, consumer unit replacement process
Outdoor Electrical Installations: IP Ratings, RCD Protection & Armoured Cable
Outdoor electrical: IP44 minimum for external fittings, RCD protection mandatory, armoured cable (SWA) burial depths
Part P Building Regulations: Notifiable Electrical Work, Competent Person Schemes and Self-Certification
Part P overview: notifiable work list (new circuits, consumer unit, additions to kitchen/bathroom circuits), NICEIC/NAPIT self-certification routes, Building Notice alternative, EIC and BS 7671 compliance
PIR Sensor Wiring & Positioning: Detection Zones, Override Switches & False Triggers
PIR sensor wiring: 4-wire vs 3-wire, detection angles and range, dual technology sensors, override/hold-on switches
Portable Generators on Site: Safe Connection, 110V CTE Supplies, Transfer Switches and G99 Compliance
Site generators: TT earthing requirements, 110V CTE for hand tools (BS EN 60309), transfer switch requirements to prevent back-feed, G99 compliance for export-capable generators, CO safety
Smart Home Wiring: Neutral at Switches, Ethernet Runs & Future-Proofing
Smart home wiring: neutral required at all switch positions, CAT6 ethernet runs, structured wiring cabinet, dimmer compatibility
Socket Circuits: Ring Final vs Radial, Adding Sockets & Part P Compliance
Socket circuit design: ring final (32A, 2.5mm², 100m² floor area) vs radial, spur rules (one unfused spur per socket position), RCD protection requirements, Part P notifiable work
Solar PV Installation: Panel Types, Inverters, DNO & MCS Certification
Solar PV: panel types (monocrystalline vs polycrystalline), string vs microinverters, DNO G99 notification, MCS certification
Surge Protection Devices: Type 1/2/3 Classification, SPD at Consumer Unit, BS 7671:2018+A2 Risk Assessment and Installation
BS 7671:2018+A2 Regulation 443 risk assessment, Type 1 (10/350µs) at service head, Type 2 (8/20µs) at consumer unit, SPD leads <0.5m, earth conductor ≥4mm²
Three-Phase Electrical Supply: When Properties Need It & DNO Upgrade Process
Three-phase supply: 400V phase-to-phase, 230V phase-to-neutral, when needed (>23kW single phase), DNO upgrade process, three-phase consumer units and load balancing
TV Aerial and Satellite Dish Installation: Planning Rules, Signal Distribution and Masthead Amplifiers
TV aerial and satellite dish installation: planning rules, signal distribution and masthead amplifiers
What Are the Regulations and Installation Requirements for Solar PV and Battery Storage?
G99/G100 grid connection, MCS certification, BS 7671 Section 712, DC disconnects, battery storage (BS EN 62619), fire compartmentation, SEG eligibility, SAP impact
What Should Electricians Know About Smart Home and Home Automation Systems?
KNX/DALI/Lutron/HDL bus vs wireless protocols, low voltage lighting control (SELV), Part P notification, Cat6a data cabling, EV charger smart control, MCS solar integration
What Size Cable Do I Need? Electrical Cable Sizing by Circuit Type
Cable sizing by circuit type: ring final, radial, shower, cooker, EV charger with BS 7671 table references and voltage drop rules
Wiring Regulations Overview: BS 7671:2018+A2:2022, Key Changes and Practical Application
BS 7671:2018+A2:2022 (18th Edition): RCD protection for most domestic circuits, AFDD recommended (bedrooms minimum), SPD risk assessment (most new installs warranted), Section 722 for EV charging, EICR 5-year rental requirement